Your service at DRBO Greenenergy

German companyA contact team based in Germany.
Shipping informationShipping costs are shown at checkout.
German customer servicePersonal support by phone and online.
After-sales serviceDirect help with questions and warranty matters.

Need help?

Get personal advice on your product or project.

Personal advice

Do you have questions about product selection, compatibility or installation? Send us your contact details. We will get back to you personally.

We usually respond within 2 working days

Best time to contact you

SunEnergyXT 500-PowerBOX-3P – Three-Phase Connection Box | Pre-Order

Black Friday Offers end 30 Nov. Explore offers
  • Für kompatible SunEnergyXT 500 und 500 PRO
  • Drei ESS-Anschlüsse für bis zu neun Speichergeräte
  • Drei- und einphasiger Anschluss mit gemeinsamem Leistungsmanagement

PCS-Parallel-Anschlusskabel separat erhältlich. Elektrischer Anschluss und Inbetriebnahme durch eine Elektrofachkraft.

PowerBOX · Pre-registration

Get notified at launch

We’ll email you when the PowerBOX goes on sale.

Sign up (German form)
  1. Enter your email
  2. Click the confirmation link

No purchase or reservation is made when you sign up.

SunEnergyXT 500-PowerBOX-3P

01Overview

A connection for your storage system

The PowerBOX connects compatible SunEnergyXT 500 and 500 PRO units to the home distribution system. Three storage connections group ESS-A, ESS-B, and ESS-C. This allows for a system with up to nine compatible storage devices.

Which devices work together and how much power is available depends on the system configuration and firmware version. Have an qualified electrician plan the configuration and connection.

SunEnergyXT 500-PowerBOX-3P with status indicators and side connections
02System setup

How the components work together

SunEnergyXT 500-PowerBOX-3P: System overview with ESS-A, ESS-B, ESS-C, grid, generator and BACKUP
System overview: storage groups, home distribution board, optional generator and designated outputs.

The three groups ESS-A, ESS-B, and ESS-C are combined at the PowerBOX. From there, the designated connections lead to the home distribution board and the connected consumers. A generator can be connected via the designated input.

The BACKUP connection is designed as an AC output for island operation. Which consumers can be supplied must be planned for the specific installation. The connected storage system, wiring, and protective measures are the determining factors.

The storage devices, consumers, and generator shown are not included with this individual PowerBOX product.

03Power

Three-phase or single-phase: the connections

Three-phase connection

Up to 21.6 kW

SunEnergyXT 500-PowerBOX-3P: Three-phase connection on the left side
Three-phase connection on the left side of the enclosure.

Maximum available power at the three-phase connection according to the quick start guide.

Single-phase connection

Up to 7.2 kW

SunEnergyXT 500-PowerBOX-3P: Single-phase connection on the right side
Single-phase connection on the right side of the enclosure.

Maximum available power at the single-phase connection according to the quick start guide.

Both connections use a common power management system. The actually available power depends on the total power of the connected system. The two maximum values must not be added together.

The manufacturer also provides for the connection of an optional EV charger. The stated values describe the PowerBOX connections, not the charging power of a supplied wallbox.

SunEnergyXT PowerBOX in side view with single-phase connection and lower cable entries
04Connection

Storage, grid and other connections

In addition to the three ESS connections, the PowerBOX has a grid connection, a generator input and a BACKUP output for island operation. The assignment and permissible integration are determined by the manufacturer's connection diagram.

Ethernet, CAN/RS485 and potential-free contacts are provided for communication. The communication of the RT board is marked as reserved.

The displays on the front make the status of the storage groups and connections visible. You can find error indicators and the associated steps in the official documentation.

05Interfaces

Every connection in its place

SunEnergyXT 500-PowerBOX-3P: Lower storage connections and cable entries
The underside with the three ESS connections and the separate cable entries.
ESS 1, ESS 2 and ESS 3
Three connections for the compatible SunEnergyXT storage groups.
GRID
Grid input for the connection to the home distribution system.
GEN
Generator input; the integration is determined by the system connection diagram.
BACKUP
AC backup output for island operation.
Communication
Ethernet, CAN/RS485, as well as potential-free contacts. The RT board communication is reserved.
SunEnergyXT 500-PowerBOX-3P: Connection designations for storage, grid and communication
Connection designations from the quick start guide.

The qualified electrician assigns the grid and communication cables to the correct terminals and checks the specific device compatibility using the complete operating manual.

06Mounting

The right place for the PowerBOX

SunEnergyXT 500-PowerBOX-3P: Rear with wall bracket
Rear with the mount for the wall bracket.

Protected location

The enclosure has the protection rating IP54. Choose a well-ventilated, protected location without direct sunlight or immediate exposure to rain. Maintain a clearance of at least 50 cm around the device.

The mounting must be vertical. The lower connection terminals are to be arranged at a height of 1.2 to 3 m above the ground. The permissible installation height is below 2,000 m above sea level.

Installation by a qualified electrician

Electrical connection, protective measures, and commissioning are the responsibility of a qualified electrician. A separate circuit with an RCBO or a combination of RCCB and circuit breaker is required; additional protective measures depend on the installation location.

The wall must be level, stable, and designed for a load capacity of at least 100 kg. This specification is a requirement for the mounting wall, not the weight of the PowerBOX.

The surface may warm up during operation. Avoid direct contact and keep children away from the device. The location must not be near flammable, explosive, or corrosive materials.

07Operation

Set up. Check status. Operate safely.

SunEnergyXT App

The PowerBOX can be connected and configured using the SunEnergyXT app. The quick start guide contains the download QR codes for Android and iOS. Device compatibility may vary depending on the firmware version; the manufacturer recommends regular firmware updates.

Open the quick start guide with app downloads

Status indicators on the front

The indicators are labeled ESS 1, ESS 2, ESS 3, GRID, GEN IN, BACKUP, NETWORK, and STATE. A red LED indicates a warning or error. Follow the instructions in the app or use the manufacturer's error help.

SunEnergyXT 500-PowerBOX-3P: Status indicators ESS 1, ESS 2, ESS 3, GRID, GEN IN, BACKUP, NETWORK, and STATE
Labeling of the status indicators on the front.
SunEnergyXT 500-PowerBOX-3P: Open enclosure, front view
Open enclosure with internal input circuit breaker.

Commissioning and switching off

After the electrical connection, the input voltage and phase sequence are checked by a qualified electrician. If grid power is available, switching on the PowerBOX activates the connected 500 / 500 PRO according to the designated start-up procedure. For starting without grid power, the manufacturer describes a separate sequence.

Connected PV inputs can reactivate the 500 / 500 PRO and thus the PowerBOX. A complete shutdown requires the appropriate procedure from the quick start guide. Repairs and work on electrical connections are the responsibility of qualified professionals.

08Data sheet

Technical specifications at a glance

Model
SunEnergyXT 500-PowerBOX-3P
System
Three-phase PowerBOX for compatible SunEnergyXT 500 and 500 PRO
Storage connections
ESS-A, ESS-B, ESS-C; up to 9 compatible storage devices, depending on the firmware version
Three-phase connection
Max. 21.6 kW; depending on the connected overall system
Single-phase connection
Max. 7.2 kW; common power management with the three-phase connection
Other electrical connections
Grid, generator, and BACKUP for island operation
Communication
Ethernet, CAN/RS485, potential-free contacts
Dimensions W × H × D
500 × 330 × 188 mm
Protection rating
IP54; protected installation according to mounting specifications
Mounting
Vertical wall mounting, at least 50 cm clearance all around
09Scope of delivery

What you receive and what you need additionally

SunEnergyXT 500-PowerBOX-3P: Standard scope of delivery with keys, wall bracket, and mounting material
Standard scope of delivery of the PowerBOX with mounting material.

Included in the scope of delivery

  • 1 × SunEnergyXT 500-PowerBOX-3P
  • 4 × Keys
  • 1 × Wall bracket
  • 3 × Expansion bolts M8 × 80
  • 2 × Bracket screws HM5 × 18
  • 1 × Grounding screw HM5 × 12
  • 1 × Hex key
  • 1 × Quick start guide

Additionally required

The PCS parallel connection cables for connecting the storage devices to the PowerBOX are available separately and are not included in the scope of delivery.

Storage devices, an optional EV charger, and an optional generator are not part of this individual product. The qualified electrician determines the required grid and communication cables, grounding material, and protective devices for your installation.

The installation is not part of the scope of delivery.

10Connection cables

The connection to your storage devices

The PCS parallel connection cables connect the storage devices to the PowerBOX. They are available as optional accessories and are not part of the standard package offered here. The required quantity and cable routing depend on your planned system configuration.

SunEnergyXT 500-PowerBOX-3P: PCS parallel connection cables, available separately
PCS parallel connection cables: optional accessory, available separately.

For the grid connection, communication and protective earthing, the qualified electrician determines the appropriate cables and protective devices. The quick start guide contains the cable requirements; the full user manual describes the respective pin assignment.

11Product details

Close-up of the enclosure and equipment

SunEnergyXT 500-PowerBOX-3P: View from the bottom right
Front and lower connections.
SunEnergyXT 500-PowerBOX-3P: Open enclosure, side view
Lockable door and internal protective area.
SunEnergyXT 500-PowerBOX-3P: Detailed view of the input protection switch
Input protection switch behind the outer door.
12Frequently asked questions

Good to know

Is the PowerBOX itself a battery storage system?

No. It connects the connected storage groups to the designated electrical connections. The storage capacity comes from the connected storage devices.

Can I add 21.6 kW and 7.2 kW at the same time?

No. Both connections share the power management. The total power of the connected system and the current load distribution are decisive.

Which storage devices can I connect?

The quick start guide describes operation with SunEnergyXT 500 and 500 PRO and lists up to nine storage devices. Compatibility may vary with the firmware version. Check the specific configuration with your qualified electrician before installation.

Can the PowerBOX be installed outdoors?

Yes, in a sheltered location in accordance with the installation instructions. IP54 does not allow arbitrary unprotected placement: direct sunlight and immediate exposure to rain must be avoided.

Can I electrically connect the PowerBOX myself?

No. The electrical connections and tests must be carried out by a qualified electrician in accordance with local regulations.

Are the connection cables to the storage devices included?

No. The PCS parallel connection cables are offered separately. The standard package includes the PowerBOX, four keys, wall bracket, mounting hardware, Allen key, and quick start guide.

How do I connect the PowerBOX to the app?

The SunEnergyXT app is used to connect and configure the PowerBOX. You can find the download QR codes for Android and iOS in the quick start guide. The electrical system is commissioned by a qualified electrician.

What does a red LED mean?

A red LED indicates a warning or error. Check the information in the app and the SunEnergyXT troubleshooting guide. If the problem cannot be resolved with this, contact customer service or your dealer; do not open the device for your own repair attempts.

13Documentation

Documents and manufacturer contact

SunEnergyXT Holdings S.à r.l.
1, Rue Jean Piret, L-2350 Luxembourg
support@sunenergyxt.com

Recommendations